Post Offer Free
Shanghai Roadphalt Asphalt Technology Co.,Ltd  

Gold Index: 1431

You are here: home  > Shanghai Roadphalt Asphalt Technology Co.,Ltd  > Roadphalt colored cold mix asphalt pavement

Roadphalt colored cold mix asphalt pavement 

Price: 600.0 USD 
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram 
Place of Origin: Shanghai, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: AC-5/10/13
Production Capacity: 500 Ton/Tons per Week
Delivery Date: 15-30days after payment by ...
hscode:: 2517300000,2821100000
Means of Transport: Ocean,Land,Air
Packing: 25kg/ bag
Brand Name: RPT

Roadphalt colored cold mix asphalt concrete surface layer of the system is a efficient construction plan.

Roadphalt colored cold mix asphalt concrete surface layer of the system

 

Product profile

Roadphalt colored cold mix asphalt concrete surface layer of the system is a efficient construction plan. Which makes the roadphalt colored cold modified asphalt mixture fast molding by using paving equipment. The system uses unique OGFC-5 open-graded skeleton void structure, the voidage of pavement can reach more than 12%. The thickness of the molding is 0.7-37.5px .

It is used to build road colored asphalt surface or pave Colored asphalt layer on the original pavement.As a new green pavement material, the advantages of system are  economic, environmental, beautiful and convenient . 

Scope                                   

Landscape garden             

      Square 

      Non-motorized vehicle,Sidewalk

      Bridge floor , Elevated pavement

      Other pavements 

 

Product Features

I.Economy 

1. Reducing the cost of asphalt material greatly

Generally, the thickness of conventional colored hot mix asphalt concrete surface layer not less than 75px .However , the construction thickness of roadphalt colored cold mix asphalt concrete surface layer of the system just need 0.7-37.5px. Material consumption is reduced by 50%

 

2. Reduce production and construction cost

Before mixing , need to ensure aggregate dry and clean .

 

3. colourful

Cold mix technology without going through the high-temperature test, the pigment the molecular composition of has not changed, so it can maintain colorful and durable.

 

4.Environment-friendly 

Production at room temperature, so there is no asphalt smoke and dust emission.

The whole construction process, without any pollution.

 

5.Convenient construction at room temperature  

 

In the above 10 degree can be construction. Not existing the loss of cooling the mixture to cool or cold threshing and other issues during construction .

 

Excellent performance & stable quality  

 

1. Excellent cohesive property 

The system can ensure the cohesive materials have excellent cohesive properties because of  using special open-graded void skeleton structure. In addition, it cannot appear bleeding phenomenon under the vehicle load and high temperature condition

 

2. Good water permeability  

The system uses unique open-graded void skeleton structure , so that can have higher permeability coefficient. Due to the existence of gaps , the rainwater can be ruled out quickly .

 

3. Good slip resistance

The bigger voidage ,the better pavement friction .Due to the system has better slip resistance ,so that can ensure the safety of the driving .

 

4. Low noise and can improve the comfort of driving 

Roadphalt colored cold mix asphalt concrete surface layer of the system use unique OGFC-5 open-graded skeleton void structure, it can reduce the atmospheric pressure. The conventional dense graded pavement's noise can be reduced 3-4 DB  and the cement pavements noise can be reduced 4-6 DB.

 

Construction guide 

Construction process :

 

Original pavement  →  pre-treatment → feeding → paving → roller compaction →   Molding  → open the traffic

 

Steps:

Pavement pre-treatment

 

The original pavement should be dried and cleaned. Besides, the flatness and camber of the road should meet the requirement of construction.

 

Feeding

It's better to transport by using dump trucks, especially construction in large-scale. The site should have appropriate lifting equipment.

Paving

We recommend using paver and paving thickness is 0.7-37.5px. If construction in a small area ,you can use artificial paving. In order to avoid segregation, you should control the thickness and flatness of the pavement.

Roller compaction

We should finish roller compaction within 0.5-1 hours after paving .using double drum roller to static pressure 3-4 times

Open the traffic

 The road can be opened after paving is completed 24 hours later . If you need to open the traffic faster , just make sure the asphalt(the surface of the road ) is dry completely .

 

 

Packaging Detail :

25 kg / bag

1,000 kg/ bag

 

 

bigPhoto
 Ms. Gina

Tel: 86-21-55781851-8025
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shanghai Roadphalt Asphalt Technology Co.,Ltd [China (Mainland)]


Business Type:Manufacturer, Trading Company, Distributor/Wholesaler
City: Shanghai
Province/State: Shanghai
Country/Region: China (Mainland)

You May Like: