Post Offer Free
Shanghai Roadphalt Asphalt Technology Co.,Ltd  

Gold Index: 1431

You are here: home  > Shanghai Roadphalt Asphalt Technology Co.,Ltd  > Roadphalt SBS Modified Asphalt Stabilizer

Roadphalt SBS Modified Asphalt Stabilizer 

Price: 1400.0 USD 
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram 
Place of Origin: Shanghai, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: N/A
Production Capacity: 10000 Ton/ Tons per Week
Delivery Date: 15-30days after payment by ...
hscode:: 3824909000
Means of Transport: Ocean,Land,Air
Packing: bag or customized
Brand Name: RPT

Specifications
1, significantly improve the rutting resistance
2,To improve the performance of low temperature cracking

Roadphalt SBS Modified Asphalt Stabilizer

 

I. Product Profiles

 

Roadphalt SBS modified asphalt stabilizer is a kind of high performance asphalt additives which is researched and developed by Shanghai Roadphalt Technology Co., Ltd. The main effect is to improve thermal stability of modified asphalt, and solve the problem of storage segregation.

Product appearance: gray-black powder

Technical Index:

Item

Unit

Index

Active Ingredient Content

%

≥95

Heat Loss

%

≤0.5

Apparent Density

g/cm3

1.3-1.5

Flashing Point

>230

 

II. Product Features:

 

1. It's used in improving storage stability and softening point of modified asphalt, reducing dosage of SBS and improving comprehensive index of modified asphalt. After adding the  stabilizer, a stable phase interface adsorptive layer is formed between the polymer phase in modified asphalt and based asphalt, which reducing surface tension of phase interface, increasing affinity between two phase, and improving compatibility between two-phase.

 

2. To overcome the shortcoming of low softening point from modified asphalt, the softening point of modified asphalt can be increased by more than 10℃ under usual conditions, and keep the softening point of modified asphalt from reducing.

 

3. It can keep the modified asphalt from segregation during storage and transportation. The modified asphalt storage period can be up to 60 days.

 

4. The product has safety and environmental protection performance, as a non flammable product, it is stable at room temperature, non-toxic, without peculiar smell, high flash point.

 

III. The Dosage and Method

Dosage: 1.5-4.0‰ of the total asphalt

Temperature: 175-185℃

Method: Mix polymer and asphalt by colloid mill for 1-5 hours, then add the product, and continue mixing for 1-8 hours. The mixing time should be subject to laboratory formulation, dosage is 1.5-2.5‰ of the total asphalt. The product can also be evenly added into matrix asphalt with polymer at the same time, which is milled by colloid mill after adding, then put them into development tank to develop, dosage is 2.5-4.0‰ of the total asphalt.

 

IV. Storage and Transportation

 

Storage: It can be stored at room temperature.

Transportation: Convenient to transport, no need special vehicle.

 

 

 

bigPhoto
 Ms. Gina

Tel: 86-21-55781851-8025
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shanghai Roadphalt Asphalt Technology Co.,Ltd [China (Mainland)]


Business Type:Manufacturer, Trading Company, Distributor/Wholesaler
City: Shanghai
Province/State: Shanghai
Country/Region: China (Mainland)

You May Like: